7 August 2015
Jacks production of "Enerpred" have been used in large-scale project of "ZBSM MC - 162" for the construction of an overpass at the Baikal tract. Using two hydraulic rams bilateral capacity of 100 and 200 tons were working on lifting and installation of bridge spans. During work on putting supports and pouring concrete formwork bridge spans were held with the jack. In addition, with the help of jacks working synchronously adjusted levels of ready-made cards second bridge to prevent deformation of the bridge span. Hardware Factory "Enerpred" once again perfectly coped with the task - all the works were carried out without any complaints and on time!
Equipment brand "Enerpred" successfully used bridge-building organizations, as evidenced by the many positive comments from our customers all over Russia and abroad.
ENERPRED - one of the most stable and successful enterprises of the Irkutsk region, specializing in the design, manufacture and sale of tools and equipment for all industries, including the construction and repair of bridges, overpasses, tunnels, roads and railways. The company has a large production capacity and highly skilled professionals, so that can produce a large range of both standard and special equipment.
The company "ENERPRED" is always open for cooperation!